Multi-Objective Fuzzy Flow Shop Scheduling Model in a Manufacturing Company

Yükleniyor...
Küçük Resim

Tarih

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

ELSEVIER SCIENCE BV, SARA BURGERHARTSTRAAT 25, PO BOX 211, 1000 AE AMSTERDAM, NETHERLANDS

Erişim Hakkı

info:eu-repo/semantics/openAccess

Özet

This study proposes a solving methodology for multi-product parallel multi-stage cellular manufacturing company. The problem studied in this paper is a case study from a shoe manufacturing plant for producing the products according to their due dates. The manufacturing process investigated had three stages: a lasting stage, a rotary machine stage, and a finishing stage. The performance of system is measured by minimizing the total flow time and the makespan. Due to the complexity of the problem, the families of the products are decided according to the operations time to maximize the utilization in all cells with using Genetic Algorithm. Flow shop scheduling is then performed on each part family formed to determine the product sequence for each cell group by using multi objective fuzzy mixed integer linear programming modeling. The two objectives are considered to minimize the total flow time and the makespan in order to generate non-dominated solution.

Açıklama

Anahtar Kelimeler

Multi-objective optimization, Fuzzy flow shop scheduling, Genetic Algorithm, Mixed integer linear programming, Cell loading

Kaynak

28TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2018): GLOBAL INTEGRATION OF INTELLIGENT MANUFACTURING AND SMART INDUSTRY FOR GOOD OF HUMANITY

WoS Q Değeri

Scopus Q Değeri

Cilt

17

Sayı

Künye

Onay

İnceleme

Ekleyen

Referans Veren