<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Yayın:
Commercial Viability Assessment and Planning of Safety-Critical Embedded SW of Electrified Road Vehicles

dc.authorscopusid57223110298
dc.authorscopusid57202536276
dc.authorscopusid57211329266
dc.authorscopusid57202609264
dc.authorscopusid16032837000
dc.contributor.authorShah Alias Sangani, Abhishek
dc.contributor.authorHarman, Caner
dc.contributor.authorKinav, Emrah
dc.contributor.authorGöl, Mehmet
dc.contributor.authorHartavi, Ahu Ece
dc.contributor.institutionauthorGÖL, MEHMET
dc.date.accessioned2024-09-11T19:57:28Z
dc.date.available2024-09-11T19:57:28Z
dc.date.issued2021
dc.departmentİstanbul Gelişim Üniversitesien_US
dc.descriptionAAM; appen; ASSEMBLY; AVL; Densoen_US
dc.descriptionSAE 2021 WCX Digital Summit -- 13 April 2021 through 15 April 2021 -- Virtual, Online -- 168424en_US
dc.description.abstractRecent extraordinary technological progress in the field of high-voltage-batteries has led an evolution in the automotive industry, resulting in vehicle manufacturers to shift from conventional powertrains towards electric ones. However, electrified road vehicles are amazingly complex. Today, the number of operations for a modern electric vehicle grew from millions to billions per second. This is mainly fueled by the electrification and safety requirements in addition to critical core functionalities. This emphasizes the importance of software development cost, effort, and production planning in the automotive industry. In this paper, in the framework of EU funded H2020 OBELICS project, a detailed-COCOMO approach is proposed for a manually coded safety-critical embedded SW for an electric vehicle not only to plan the project well in advance but also to assess its commercial viability using quantifiable cost metrics to make the process more objective and repeatable. In this context, a case study is given for a battery-management software using an algorithmic model. The case-study has demonstrated not only the planning requirements but also the impact of project type on effort and time estimation in each phase of the software lifecycle. The results have shown that inaccurate software project type estimation can lead an error of up to 16% in effort and 19% in development time according to the phase. It also shows that reliability, database size and complexity are the major contributors of the total time, effort and hence of the cost. The results have also demonstrated the impact of model-based design and automated code generation tools on planning for different phases of the V-cycle briefly. © 2021 SAE International. All rights reserved.en_US
dc.description.sponsorshipHorizon 2020 Framework Programme, H2020, (769506)en_US
dc.description.sponsorshipThis project has received funding from the European Union’s Horizon 2020 research and innovation programme under Grant Agreement no. 769506.en_US
dc.identifier.doi10.4271/2021-01-0132
dc.identifier.issn0148-7191en_US
dc.identifier.issue2021en_US
dc.identifier.scopus2-s2.0-85104841614en_US
dc.identifier.scopusqualityQ3en_US
dc.identifier.urihttps://doi.org/10.4271/2021-01-0132
dc.identifier.urihttps://hdl.handle.net/11363/8278
dc.language.isoenen_US
dc.publisherSAE Internationalen_US
dc.relation.ispartofSAE Technical Papersen_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.snmz20240903_Gen_US
dc.subjectBattery Management System; Cost Estimation; detailed COCOMO; Electric Vehicle; Safety-Critical Embedded Software; Software Planningen_US
dc.titleCommercial Viability Assessment and Planning of Safety-Critical Embedded SW of Electrified Road Vehiclesen_US
dc.typeConference Objecten_US
dspace.entity.typePublication
dspace.relatedentity.typePerson
local.indexed.atScopusen_US
person.identifier.orcid0000-0003-3708-0422

Dosyalar