Ara
Toplam kayıt 2, listelenen: 1-2
Multi-Objective Fuzzy Flow Shop Scheduling Model in a Manufacturing Company
(ELSEVIER SCIENCE BV, SARA BURGERHARTSTRAAT 25, PO BOX 211, 1000 AE AMSTERDAM, NETHERLANDS, 2018)
This study proposes a solving methodology for multi-product parallel multi-stage cellular manufacturing company. The problem studied in this paper is a case study from a shoe manufacturing plant for producing the products ...
Chaos in hydrology: A case study in Konya Basin, Turkey
(WORLD SCIENTIFIC PUBL CO PTE LTD, PO BOX 128 FARRER RD, SINGAPORE 9128, SINGAPORE, 2018)
Every natural behaviour is non-linear, but not always is chaotic. This paper aims to
investigate low dimensional chaotic behaviour of study area: Konya Basin by using nonlinear time series techniques with three stages: ...